"This opportunity is already expired. However, you can always try to contact the employer for verification."
Opportunity ID:
MYO-202130858 
Type :
Full time 
Position Level :
Top Management 
Industry :
Engineering - Plastics/ Rubber 
Job Specialization :
Sciences - Material Science 
City :
Senai 
Description :
• Manage daily production department effectively and ensure best practices
• Plan manpower capacity and arrange the work schedule, review production planning to achieve production target and timely delivery
• Ensure all equipment, tools, materials and supplies are readily and continuously available to carry out production processes
• Assure that product and process quality are compliant to internal and customer quality expectation
• Preparing and  analyzing production and quality reports,  identify root cause and able to solve problem with detail study investigation, observation and identification subsequently with suggestion and solution
• Implement Lean/continuous improvement, process improvement and small group activity to achieve higher productivity, efficiency, lead time reduction, control wastages and cost saving
• Liaise with other departments/sections in daily production work as part of the team
• Promote teamwork within team as well as other functions at shop floor level
• Strengthen the team capability and discipline. Coach, train and provide development opportunities for direct reports
• Monitor and  evaluate team members performance and provide trainings to meet production target and quality expectations
• Lead the team to comply with Safety, Health Environment Policies and 5S activities
• Acting as a team role model and change-agent. Positively lead and influence team members to work together to achieve individual and business goals
 
Requirements :
• Degree in Mechanical Engineering or equivalent
• At least 5 years of experience preferably in plastic injection moulding manufacturing/Quality/Maintenance or other manufacturing related background
 
Lowest Qualification :
Bachelor Degree 
Closing Date :
3/30/22, 12:00 AM 

Plastic Injection


City :
Senai
State :
Johor
Country :

Description

Plastic Injection Molding for PCB


Benefit

Annual Leave: 12 Days
Public Holiday : 14 Days
AWS / Bonus : Bonus & Incentive ( Depend company profit)
Allowance : Night shift allowance for shift workers
Medical/Insurance benefits : Staff Insurance Benefits
Other : Parking /Uniform /Canteen/Birthday Gift